Jt25 operator’s manual – Ditch Witch JT25 User Manual

Page 54

Advertising
background image

JT25 Operator’s Manual

Controls - 53

ESID

7.

Electrical power supply
indicator

Green light means control
box has sufficient electrical
power for operation.

Strike system is ready to
operate if OK indicator is also
on.

8.

Self test button

To start manual self test,
press.

To reset system after a strike
has been detected, press.

Checks all systems and circuits
except voltage limiter.

NOTICE: See “If an Electric Line is
Damaged” on page 18.

Item

Description

Notes

Advertising