9 - START UP PROCEDURE
Natural Gas and Propane
3.
Measure CO
2
at high fire and compare to table.
Adjust CO
2
if needed using figure 9-3. See figure
9-5 for combustion air analyzer port.
High Fire Combustion - 50/75/100/15/200 MBH
Gas
CO
2
Design
Target
CO
Flame
Signal
Min. Max.
μA
Natural Gas
9.0 9.5%
9.5%
<200ppm
6.5-7.5
Propane
10.0 11.0
11.0%
Low Fire Combustion - 50/75/100/15/200 MBH
Gas
CO
2
Design
Target
CO
Flame
Signal
Min. Max.
μA
Natural Gas
8.8 9.3%
9.0%
<100ppm
>3.3
Propane
9.8
10.5
10.0%
NOTICE
Contact Technical Support @ 800-325-5479 for
additional information or assistance.
Natural Gas only
4.
Measure input. Compare to table 11. Continue to
measure input and CO
2
until both measured values
are within range specified in tables
.
Propane Gas
Most propane systems do not have flow meters.
1.
Check CO
2
. Propane should be between 10% and
11.0%.
• If CO
2
is low increase gas flow following figure
9-3.
• If CO
2
is high decrease gas flow following figure 9-3.
1/4" Flat Head
Screwdriver
FIGURE 9-3 Gas Valve - Models
• To increase gas flow turn 'throttle' left or counter
clockwise
.
• To decrease gas flow turn 'throttle' right or
clockwise .
• Limit adjustment to one turn and retest.
Verify Burner, Proper Operation
1.
Inspect burner flame through Sight Glass. See
figure 11-1.
2.
Operate boiler through several heating cycles,
including domestic hot water, if used. Verify proper
operation.