Dunkirk Helix VX Vertical Laser Tube Wall Hung Stainless Steel Modulating Condensing Boiler User Manual

Page 85

Advertising
background image

85

50/75/100 MBH - PRIMARY LOOP EQUIVALENT LENGTH CALCULATION & PUMP SELECTION

Chart 3

A

B

C

Pipe Diameter

Fitting

Enter Number of

Fittings

Multiply By

Equivalent Length

A x B

1¼"

(Any pipe/fitting

larger than 1¼",

count as 1¼")

90° Elbow

1.875

45° Elbow

1

Tee-branch

3.75

Tee-through

1.25

Swing check valve

6.25

Lift check valve

37.5

Enter Total 1¼" straight pipe length in feet

Add up numbers in column C

Total equivalent length of Primary

Multiply Total of Column C in Chart 3 by 0.088

Pump Factor

Chart 4

Total Equivalent Length of 3/4"

Pipe Loop, L, ft.

Pump options (Minimum)

From

To

Grundfos

Taco

B&G

0

15

UP 15-42

Taco-008

NRF-22

16

40

UP 26-64

Taco-0014

NRF-45 speed-3

41

80

UP 26-99

Taco-0013

NRF-36 speed-3

Note: If the heating system uses antifreeze solution 30% or higher, choose the next larger size pump listed in

this table.

Advertising