Dunkirk Helix VX Vertical Laser Tube Wall Hung Stainless Steel Modulating Condensing Boiler User Manual

Page 7

Advertising
background image

7

3.1 Component Listing - Refer to diagrams on

following pages.

1.

Gas Shutoff Valve (Field Installed) Fuel supply

isolation during servicing. Factory supplied, Field installed.

See section 7.

2.

Vent Connector See section 6.

3.

Combustion Air Inlet (2"/3") See section 6.

4.

Igniter

5.

Flame Sensor

6.

Sight Glass Permits observation of burner flame.

7.

Flue Air Mixture Pressure Test Port - Not available

on all models.

8.

User Interface Displays information regarding boiler

condition. Allows adjustment of boiler operating

parameters. NOTE: Does not replace thermostat used

to control central heating space.

9.

Boiler Control Module

10.

Heat Exchanger

11.

ASME Plate

12.

Low Voltage Terminal Strip Connection of all low

voltage wiring, including thermostat.

13.

Return Water Temperature Sensor

14.

Return Water From Heating System (In) and

Drain Valve Connection supplied at bottom of boiler.

See section 5.

15.

Condensate Drain Boiler produces a liquid

(condensate) as a by-product of combustion. (See page

14)

16.

Condensate Trap (Field Installed) Condensate must

be piped to appropriate drain. See section 6.

17.

Jacket Panel Latch

18.

Supply Water Outlet to Heating System (Out)

Connections supplied for connecting from bottom of

boiler. See section 5.

19.

Temperature Pressure Gauge (Field Installed)

20.

High Voltage Junction Box For connection of 120V

components. See section 8.

21.

Flue Collector

22.

Vent Temperature Sensor

23.

Combustion Analysis Test Port

24.

Gas (Control) Valve Delivers proper quantity of fuel

to Combustion Air Blower. See section 7.

25.

Combustion Air Blower Delivers proper quantity of

combustion air, receives fuel from gas valve, mixes air

and fuel sending mixture to burner for combustion.

26.

Heat Exchanger Surface Temperature Switch

27.

Supply Water Temperature Sensor and High Limit

Switch

28.

Safety Relief Valve Factory supplied, Field installed.

See section 5.

29.

Pump Relay

30.

Burner not shown (see page 39)

31.

Wall Hanging Support Bracket not shown (see page

12) Integral to boiler. Allows wall mounting when used

with supplied wall mounting bracket. See section 4.

32.

Gas Connection (See section 7)

3 - COMPONENT LISTING

Advertising