7 Flue Preparation

Diagram 7.1

7510

7639

TOP OUTLET/
REAR FLUE

TOP OUTLET/
SIDE FLUE

15mm

VIEW ’B’

VIEW ’B’

15mm

STD./EXTD. TOP OUTLET FLUE PACK & 1 METRE EXTENSION KIT

SCREW
& TAPE

SCREW
& TAPE

SCREW
& TAPE

SCREW
& TAPE

2 x 1 metre extension kits may be joined together.

FLUE LENGTH

MAX 840mm (extd.)

MAX 570mm (std)

FLUE LENGTH

MAX 840mm (extd.)

MAX 570mm (std)

15mm

SCREW
& TAPE

239mm

54mm

TOP OUTLET FLUE PACK

’X’

RHD SIDE FLUE ’X’ plus 254mm = FLUE LENGTH
LHD SIDE FLUE ’X’ plus 10mm = FLUE LENGTH

RHD SIDE FLUE ’X’ plus 254mm = FLUE LENGTH
LHD SIDE FLUE ’X’ plus 10mm = FLUE LENGTH

REAR FLUE ’Y’ plus 69mm = FLUE LENGTH

’Y’

’X’

15mm

SCREW
& TAPE

’Y’

’Y’ plus 69mm = FLUE LENGTH

’Y’

FLUE LENGTH

510mm MAX.

15mm

80mm

REAR OUTLET FLUE PACK

SCREW
& TAPE

SCREW
& TAPE

FOAM
SEAL

5mm

’Y’ plus 95mm = FLUE LENGTH

’Y’

80mm

REAR OUTLET FLUE PACK & 1 METRE EXTENSION KIT

FOAM
SEAL

’Y’ plus 95mm = FLUE LENGTH

2 x 1 metre extension kits may be joined together.

TOP STD.

REAR
SIDE R.H.
SIDE L.H.

TOP EXTD.

REAR
SIDE R.H.
SIDE L.H.

REAR STD.

REAR

75

170

510

415

-

MINIMUM

WALL

THICKNESS

MINIMUM

FLUE

LENGTH

MAXIMUM

FLUE

LENGTH

"Y"

BOILER MOUNTING FACE

TO EXTERNAL WALL FACE

"X"

BOILER CASING TO

EXTERNAL WALL FACE

MAXIMUM DISTANCE FROM

144
334

90

500

-
-

-

316
560

75
75
75

75
75
75

144
334

90

840
840
840

770

-
-

-

586
830

570
570
570

FLUE

PACKS

NOTE :

IF IT IS NECESSARY TO CUT THE DUCTS
TO ACHIEVE THE "FLUE LENGTH" MAKE SURE
THAT THE OVERLAPS ARE AS FOLLOWS :-
THE OVERLAP FOR AIR DUCT = 25mm
THE OVERLAP FOR FLUE DUCT = 50mm

THE MAXIMUM LENGTHS CAN BE INCREASED
BY AN ADDITIONAL 2 METRES WITH THE USE
OF THE 1 METRE EXTENSION KITS.

NOTE :

THIS APPLIES TO STANDARD KITS ONLY.