14 replacement of parts – Glow-worm Compact 80E User Manual

Page 32

Advertising
background image

32

221742D

14.1 Fan

Before starting refer to Section 11.

Disconnect the two electrical connectors at the fan by pulling the
boots not the wires, see diagram 14.1.

Remove the two flexible tubes from the fan, see diagram 14.1.

Note: When replacing the tubes from the air pressure switch
ensure the lower (red) tube from the fan connects to the upper
connection of the switch.

Remove the fan, secured with a screw at the front, ease the fan
outlet from the flue duct and retaining lip at the rear, see diagram
14.1.

Note: To fit the fan, locate it into the flue duct and rear retaining
lip, push fully up to ensure a good seal, then secure the fan with
the screw, see diagram 14.1.

The polarity of the two electrical connectors is not important.

14.2 Main Burner

Before starting refer to Section 11.

Remove as described in Servicing Section 12.

Remove the spark electrode assemblies from the burner secured
by three screws see diagram 12.1.

Fit spark electrode assemblies to new burner.

Taking care fit new burner.

14.3 Main Injector

Before starting refer to Section 11.

Remove as described in Servicing Section 12.

Unscrew the main injector.

When fitting the new main injector, fit the new copper sealing
washer, supplied, to ensure gas soundness, see diagram 14.2.

14.4 Spark Electrodes and Sensing Electrode

Before starting refer to Section 11 General Data.

Isolate the boiler from the electrical supply.

Remove the outer case front and the inner case front, refer to
Sections 11.4 and 11.5.

Remove the spark electrode lead and silicone sleeve, remove
the securing screw and electrode, see diagram 12.1.

14.5 Ignition Leads and Sensing Lead

Before starting refer to Section 11.

Disconnect the silicone sleeve and lead at the electrode, see
diagram 12.1. (White to sensing electrode).

Important Note : If replacing one of the ignition leads it will
be necessary to disconnect both from their electrodes and
untwist them from one another and the earth lead. Make
sure when replacing the two ignition leads that they are
tightly twisted together again, and the earth lead is twisted
round the pair, see diagrams 10.2 and 12.1.

Disconnect leads from the two retaining clips at the side of case.

Remove the two screws securing the controls facia, see diagram
9.1.

Hinge the control fascia open.

Remove the control board cover, see diagram 10.2.

Remove the lead on the control board and withdraw from
grommet, see diagram 14.8.

14 Replacement of Parts

Diagram 14.2

6961

MANIFOLD

COPPER
SEALING
WASHER

INJECTOR

14.6 Boiler Overheat Cutoff

Before starting refer to Section 11.

Disconnect the electrical connections, unclip to remove the
overheat cutoff, see diagram 14.4.

14.7 Pressure Gauge

Before starting refer to Section 11.

Remove case base, see diagram 10.3.

Open the controls cover door. Remove the two screws securing
the controls facia, see diagram 9.1.

Hinge the control fascia open.

Release the water pressure and drain the central heating circuit
of the boiler, refer to Section 11.3 and 11.6.

Disconnect the pressure gauge connection from the safety
valve, discard the washer, see diagram 14.5.

AIR PRESSURE
TUBES

SECURING
SCREW

Diagram 14.1

6985

ELECTRICAL
CONNECTION
(2)

RETAINING
LIP

FAN

RED

CLEAR

Advertising