4 installation 5 casing location / fitting – Glow-worm Hideaway 100BF User Manual

Page 12

Advertising
background image

12

221764B

4 Installation

5 Casing Location / Fitting

Diagram 4.7

PIPEWORK CASING
CLEARANCES

57 MAX.

(2

1

/

4

in.)

'A'

VIEW ON ARROW 'A'

57 MAX.
(2

1

/

4

in.)

1524

BOILER

Diagram 4.8

REAR CONNECTION
PIPEWORK (28mm)

1525

57 MAX.
(2

1

/

4

in.)

VIEW ON
ARROW 'B'

'B'

BOILER

57 MAX.
(2

1

/

4

in.)

FOR
MINIMUM
CLEARANCE

Diagram 4.9

TERMINAL AND AIR DUCT -
STANDARD OR SHORT

1280

BOILER
AIR DUCT

WALL
PLATE

INNER BAFFLE/
FLUE DUCT
ASSEMBLY

AIR DUCT
ASSEMBLY

WIRE GUARDS

SCREW (4)

OUTER
BAFFLE

5.1 Side Vent Grille

One side vent grille is supplied with the boiler and can be fitted
at the rear of the left or right-hand side casing. The grille is fitted
on the opposite side to any pipework connections.

If required, fit the grille, using plastic pegs at the top and bottom,
see diagram 5.1, prior to fixing the side casing. The plastic pegs
are a tight fit, so they are best pushed home with a flat faced tool.

Discard the grille if water connections are made on both sides
of the boiler or if the boiler is screened by fixtures.

5.2 Side Casings

Fit each side casing by locating the lugs into the appropriate
slots in the boiler plinth, see diagram 5.2, depending on the
required casing height, see diagram 1.2.

Secure the side casings to the casing brackets at the front and
top.

Advertising