General data – Glow-worm Hideaway 100BF User Manual

Page 6

Advertising
background image

6

221764B

BOILER CASING HEIGHT(S)

Diagram 1.2

MAX.900 (35

1/

2

in.)

MID. 890 (35in.)
MIN. 860 (34in.)

MAX.867 (34

1/

8

in.)

MID. 857 (33

3/

4

in.)

MIN. 827 (32

1/

2

in.)

BOILER
WITH TOP
CASING

BOILER
WITHOUT
TOP CASING

BOILER CASING ALTERNATIVE
HEIGHT POSITIONS

MIN.

MAX.

MIN.

MAX.

MID.

MID.

To
floor
level

FLOOR
LEVEL

0982

General Data

Diagram 1.4

MINIMUM CLEARANCES
UNDER WORKTOP, FIXTURES

0865

10

(

3/

8

in.)

10

(

3/

8

in.)

3 (

1/

8

in.)

BOILER

WITH

TOP

CASING

BOILER

WITHOUT

TOP

CASING

CUPBOARD

CUPBOARD

CUPBOARD

10 (

3/

8

in.)

WORKTOP OR FIXTURE

10

(

3/

8

in.)

1387

WORKTOP

10

(

3/

8

in.)

10

(

3/

8

in.)

BOILER

BOILER

5
(

3/

16

in.)

CUPBOARDS

Diagram 1.3

MINIMUM CLEARANCES
LEVEL WITH WORKTOP

494 MIN.

(19

7/

16

in.)

494 MIN.

(19

7/

16

in.)

1.5 B.S.I. Certification

This boiler is certificated by B.S.I. for safety and performance.
It is, therefore, important that no alteration is made to the boiler,
without permission, in writing, from Hepworth Heating Ltd.

Any alteration not approved by Hepworth Heating Ltd., could
invalidate the B.S.I. certification, boiler warranty and could also
infringe the Statutory Requirements.

1.6 Gas Supply

The gas installation shall be in accordance with the current
issue of BS6891.

The supply from the governed meter must be of adequate size
to provide a steady inlet working pressure of 20mbar (8in wg) at
the boiler.

On completion test the gas installation using the pressure drop
method and suitable leak detection fluid, purge in accordance
with the current issue of BS6891.

1.7 Electrical

WARNING. This boiler must be earthed.

The electrical installation must be carried out by a competent
person.

All external components shall be of the approved type and shall
be connected in accordance with the current issue of BS7671
and any local regulations which apply.

Connection of the boiler and any system controls to the mains
supply should be through an unswitched shuttered socket outlet
and 3A fused 3 pin plug both to the current issue of BS1363.
Alternatively, a 3A fused double pole isolating switch may be
used, having a minimum double pole contact separation of
3mm, serving the boiler and system controls only.

Heat resistant flexible cable of at least 0.75mm

2

(24/0.20mm)

to BS6500 Table 16, must be used for all connections within the
boiler casing.

1.8 Boiler Location

This boiler is not suitable for outside installation.

The boiler may be installed in any room, although particular
attention is drawn to the requirements of the current issue of
BS7671 with respect to the installation of the boiler in a room
containing a bath or shower. Any electrical switch or boiler
control utilising mains electricity should be so situated that it
cannot be touched by a person using the bath or shower. The
electrical provisions of the Building Standards (Scotland)
Regulations are applicable to such installations in Scotland.

The boiler must stand on a level floor, conforming with the local
authority requirements and building regulations. The base
temperature is within the requirements of BS5258. The boiler
may be stood on a wooden floor but a metal base plate is
required to protect plastic tiles and similar floor coverings.

Suitable clearance needs to be available at the sides of the
boiler to facilitate direct connection of pipework and making
good around the flue assembly. The actual clearance required
will vary with site conditions.

The casing can be fitted to the boiler at various heights. The top
casing can be discarded, if preferred, when fitting the boiler
under a worktop or fixture. See diagram 1.2.

When the boiler is to be installed level with work surfaces etc.,
minimum clearances should be provided as shown in diagram
1.3. Work tops which overhang the cupboard sides almost in
contact with the casing top, require a larger minimum air gap.
Flush sided fixtures require the same overall minimum space
but can have a reduced air gap on one side.

Boilers to be installed under work tops or fixtures, with or without
the casing top fitted, should be positioned to provide minimum
clearances as shown in diagram 1.4.

To facilitate minimum clearances it may be necessary to modify
the kitchen units or fixtures, depending upon which type of
connections are used.

A front access clearance should be provided as shown in
diagram 1.5.

The minimum gap behind the top casing is as shown in diagram
1.1. The boiler can be sited further away from the wall if required
to align with kitchen units etc. Refer to Section 3.5.

Combustible wall material must be 25mm (1in) away from flue
components. Refer to Section 3.5.