7 Commissioning

PILOT FLAME DIMENSION

Diagram 7.2

PLINTH / DOOR FITTING

Diagram 7.3

FLAME
DIMENSION

SPARK GAP
DIMENSION

0937

Pilot shield
omitted
for clarity

13 (

1

/

2

in.)

APPROX.

3-4mm.
(

1

/

8

in.)

PILOT
BURNER
ASSEMBLY

VIEWING
WINDOW

1356

VIEW 2

VIEW 1

VIEW 2

PLINTH
FRONT

LOWER
HOOK

VIEW 1

UPPER
HOOK

DOOR
FASCIA

STUD

7.3 Operational Checks

Check operation of the flame failure device as follows, with the
main burner alight, turn the gas valve control knob “A” fully
clockwise to its stop'

' , this will extinguish the main and pilot

burners. The safety device should close before 60 seconds
have elapsed, a click from the gas valve will indicate it has
closed.

Remove the pressure gauge and refit the pressure test point
screw “G”, make sure that a gas tight seal is made.

Turn thermostat “B” to “O” then relight the pilot burner as
Section 7.1.

Relight the main burner.

Check that the boiler thermostat and all automatic controls are
operating correctly.

Do not attempt to adjust the thermostat calibration screw.

Relight the main burner and check for gas soundness with a
suitable leak detection fluid.

7.4 Completion and User Information

Instruct and demonstrate the efficient and safe operation of the
boiler, heating and hot water system.

Hand the Instructions for Use to the user, for their retention,
making sure that they are understood.

Advise that to ensure the efficient and safe operation of the
boiler it is recommended that it is checked and serviced at
regular intervals. The frequency of servicing will depend upon
the installation conditions and usage, but in general once a year
should be enough.

It is that law that any servicing must be carried out by a
competent person.

Draw attention, if applicable, to the current issue of the Gas
Safety (Installation and Use) Regulations, Section 35, which
imposes a duty of care on all persons who let out any property
containing a gas appliance.

Fit the plinth front by locating the sides over the boiler plinth then
lowering to engage the upper and lower hooks, see diagram
7.3.

Fit the door by locating the hooked runner at the bottom into the
slots in the side casings and pushing on to the studs on the side
casings.

Reminder - Leave these instructions and the “Benchmark”
logbook with the user.