9 replacement of parts – Glow-worm Hideaway 100BF User Manual

Page 19

Advertising
background image

19

221764B

9 Replacement of Parts

9013

Diagram 9.1

REMOVAL OF GAS VALVE

PILOT ASSEMBLY

Diagram 9.2

0935

PILOT
INJECTOR

PILOT
TUBE

PILOT
BURNER
ASSEMBLY

PILOT
SHIELD

SPARK
ELECTRODE

SECURING SCREW (2)
AND NUT (2)

THERMOCOUPLE

IGNITION LEAD
(CLEAR END)

GAS
VALVE
PLUG

GAS
VALVE

GAS
OUTLET
FLANGE
SCREW
(4)

PILOT TUBE

NUT

INSULATION PANELS

Diagram 9.3

SIDE
INSULATION
PANEL

1281

SCREW

REAR
INSULATION
PANEL

CLIP

BAFFLE
TRAY

GRAPHITE
COATED NUT

Remove the nut retaining the spark electrode and remove.

Remove the two screws and nuts securing the pilot burner and
shield to the combustion chamber cover.

Hook pilot injector over pilot tube olive when refitting.

Check that the pilot flame length is as shown in
diagram 7.2.

Replace thermostat phial as Section 8.5.

9.5 Spark Electrode

Gain access to the boiler as Section 8.1.

Disconnect the thermocouple nut and withdraw thermocouple
from pilot burner, see diagram 9.2.

Disconnect the nut retaining the spark electrode and remove.

When re-assembling check that spark gap is as shown in
diagram 7.2

9.6 Insulation Panels

Gain access to the boiler as Section 8.1.

Remove the burner assembly as Section 8.2.

Remove the two screws retaining each side insulation panel
within the combustion chamber and remove panel, see diagram
9.3.

Release the rear insulation panel upper clips and lift panel out.

Refit thermostat phial as Section 8.5.

9.7 Boiler Thermostat

Follow the relevant instructions in Section 8.1.

Remove the mains inlet connector by pulling downwards, see
diagram 8.1.

Remove the retaining split pin from the phial pocket then
withdraw the phial and capillary, see diagram 4.5.

Pull off the thermostat control knob.

Gain access to inside of the control box by removing the
securing screw located at the top of control box and unhooking
at the bottom, see diagram 9.4.

Remove the two screws which secure the boiler thermostat to
the control box, see diagram 9.4.

Tilt the thermostat so that the electrical connections can be
removed.

Withdraw boiler thermostat from control box complete with
capillary tube and phial.

Refer to diagram 9.5 to connect electrical connectors.

Replace the thermostat phial as the relevant part of Section 8.5.

Make sure that the capillary is positioned so that it passes
through the cut out in the control box, see diagram 9.4.

9.8 Piezo Unit

Pull door forward at the top to disengage the studs and lift to
release from slots, see diagram 7.3.

Remove mains inlet connector by pulling downwards, see
diagram 8.1.

Gain access to inside of the control box by removing the
securing screw located at the top of control box and unhooking
at the bottom, see diagram 9.4.

Disconnect the ignition lead at the piezo unit.

Note: To ease the removal of the piezo unit it is advisable to
temporarily remove the boiler thermostat from the control box.

Depress the retaining tabs and remove the Piezo unit.

9.9 Ignition Lead

Gain access to the boiler as Section 8.1.

Disconnect the ignition lead at the piezo unit, see diagram 9.4
and section 9.8.

THERMOCOUPLE
NUT

Advertising