4 installation – Glow-worm Hideaway 80CFF User Manual

Page 12

Advertising
background image

12

2000225006B

CASING BRACKETS FITTING

Diagram 4.6

9858

FRONT
CASING
BRACKET

No.8
SCREW
(4)

CAPTIVE
NUT

UPPER CASING
BRACKET

CAPTIVE
NUT

No.8
SCREW
(4)

Diagram 4.4

PIPEWORK CASING
CLEARANCES

Diagram 4.5

REAR CONNECTION
PIPEWORK (28mm)

9861

FOR MINIMUM
CLEARANCE

9860

4.4 Pipework

When the front tappings are used, it is essential that any
pipework or fittings do not project more than shown in diagram
4.4.

When using a rear tapping with Rc (1in BSP) fitting for 28mm od
pipework, it is recommended that a short nipple and an Rc
thread (BSP) to copper elbow is used. If the pipework is required
to run back to the wall, make sure that it will clear the boiler air
duct and, if working to minimum clearance, does not project too
far from the boiler, see diagram 4.5.

Do not route any pipework, water or gas, across the front of the
combustion chamber cover.

The gas pipework must be along the left hand side of the boiler.

4.5 Casing Brackets

Fit the two upper and two front casing brackets shown in
diagram 4.6, using the No.8 screws provided.

NOTE: The screws will already be fitted.

Push the captive nuts, supplied loose, on to the casing brackets
as shown in diagram 4.6.

4 Installation

9863

SIDE CASINGS FITTING

Diagram 4.7

MAX.

SIDE
CASING
(R.H.)

MIN.

BOILER
PLINTH

FRONT
CASING
BRACKET

No. 8
SCREW
(4)

LOCATING
SLOTS

Advertising