8 servicing – Glow-worm Hideaway 80CFF User Manual

Page 21

Advertising
background image

21

2000225006B

8.2 Boiler Flueways

Remove flueway baffles noting that there are 2 centre and 2
side flueway baffles, see diagram 8.8.

Place a sheet of paper in the combustion chamber to catch any
flue debris.

Thoroughly clean boiler flueways and fins with a suitable stiff
brush.

Replace in reverse order, after completing the relevant
instructions in sections 8.3 and 8.4.

8.3 Burner and Injector

Remove the two screws and nuts securing the burner support
bracket to the combustion chamber cover, see diagram 8.9.

Remove the graphite coated nuts on the supply feed pipe at the
rear of the burner to release the burner, see diagram 8.10.

Clean the burner. Use a vacuum cleaner or suitable stiff brush
(not wire) to clean the burner thoroughly, making sure that all
the burner ports are clear and unobstructed.

Check the burner injector for blockage or damage and replace
if necessary, see diagram 8.11.

With the burner removed the injector can be inspected and
cleaned as necessary.

For cleaning do not use a wire or sharp instrument on the hole.

If removed, use a little suitable sealant on the external thread
when refitting to make sure a gas tight seal is made.

Diagram 8.8

FLUEWAY
BAFFLE

HEAT
EXCHANGER

8 Servicing

SIDE
FLUEWAY
BAFFLE

HEAT
EXCHANGER

TOGGLE
LATCHES

FAN

Diagram 8.6

0886

WING NUT

SELF
TAPPING
SCREWS
(3)

Diagram 8.7

BOTTOM PLINTH
PANEL

BOTTOM PLINTH
PANEL

Advertising