4 installation – Glow-worm Hideaway 80BFF User Manual

Page 14

Advertising
background image

14

221958B

4.10 Side In-fill Panel (if required)

A side in-fill panel is supplied with the boiler, which can be fitted
at the rear of the left or right hand side casing but can be
discarded if the water connections are made on both sides of
the boiler or if the boiler is screened by fixtures. The in-fill panel
will usually be fitted on the side where there no pipework
connections.

Insert the push fit plastic location peg, supplied, through the in-
fill panel and side casing holes and secure with the spring clips,
see diagram 4.13.

NOTE

The boiler is assembled at the factory with the control box and
heat shield fitted in the lower casing height position.

9863

SIDE CASINGS FITTING

Diagram 4.14

MAX.

SIDE
CASING
(R.H.)

MIN.

BOILER
PLINTH

FRONT
CASING
BRACKET

No. 8
SCREW
(4)

LOCATING
SLOTS

4 Installation

Diagram 4.13

Diagram 4.15

SCREW

SIDE CASING
(R.H. SHOWN)

UPPER
CASING
BRACKET

PLASTIC
PEG

PLASTIC
PEG

SPRING
CLIP

SIDE
CASING
(R.H.SHOWN)

UPPER VIEW

LOWER VIEW

SPRING
CLIP

SIDE
CASING
(R.H. SHOWN)

IN-FILL
PANEL

IN-FILL
PANEL

4.11 Side Casings

Fit the side casings by locating their lugs into the appropriate
slot in the boiler plinth, see diagram 4.13, depending on the
required height, there are two options, see section 1.7.

Secure the casing sides to the front and rear upper casing
brackets with self-tapping screws supplied, see diagrams 4.13
and 4.15.

Advertising