4 installation – Glow-worm Hideaway 80BFF User Manual

Page 16

Advertising
background image

16

221958B

4.13 Water & Gas connections

Replace fan access door, heat shield and control box.

Note: When replacing the fan access door make sure the lip at
the top of door fits into and behind the slotted bracket located at
the top of the boiler.

As there are two casing height options, the control box height
and the heat shield may have to be adjusted to suit your
requirements.

Complete the water connections to the boiler.

Fill, vent and flush the system.

Check for any water leaks and put right.

Make the gas connection to the service cock, at the lower left
hand side of the boiler, see diagram 1.1.

The whole of the gas installation, including the meter, should be
inspected, tested for soundness and purged in accordance with
the current issue of BS6891.

4.14 Top Casing

Refer to diagram 4.21.

Fit two plastic pegs, one on each side, in the holes on the top
casing. The plastic pegs are a tight fit and are best pushed home
with a flat faced tool.

Secure front of top casing with the screws provided.

4 Installation

Diagram 4.21

TOP CASING

9865

SCREW (2)

PLASTIC
PEG (2)

Diagram 4.20

FRONT AIR PRESSURE
SWITCH TUBE (CLEAR)

FAN ELECTRICAL
CONNECTORS

10149

Diagram 4.19

FLUE DUCT
EXTENSION PIECE

FAN

AIR
PRESSURE
TUBE (RED)

FAN
SECURING
SCREW

REAR AIR PRESSURE
SWITCH TUBE (RED)

10259

Advertising