4 flue and appliance preparation – Glow-worm Ultimate 30FF User Manual

Page 13

Advertising
background image

13

221518L

4 Flue and Appliance Preparation

Diagram 4.1

Diagram 4.2

Diagram 4.3

Standard Flue terminal illustrated.

Standard Flue terminal illustrated.

6827

6828

REAR FLUE LENGTHS

Distance R = Wall thickness

STD.

75mm to 505mm

1M

75mm to 1015mm

2M

75mm to 2015mm

3M

75mm to 2995mm

SIDE FLUE LENGTHS

Distance S = External wall face to boiler case

STD.

81mm to 513mm

1M

81mm to 1023mm

2M

81mm to 2023mm

3M

81mm to 3003mm

4791

CARTON
TOP

LOOSE
ITEMS PACK

WALL
TEMPLATE

INSTRUCTIONS

MOUNTING
BRACKET

BOILER

4.1 Unpacking

Open the carton, check the items supplied against the boiler
pack contents list on the flap and diagram 4.1.

4.2 Flue Position and Length

Determine flue application, length and terminal position before
starting.

Refer to diagram 4.2 or 4.3.

If you are using a Flue Bend or a Vertical Flue Kit, please follow
the instructions supplied with that kit.

To make a neat finish to the flue outlet a flue collar kit, part
No.443286, with instructions, is available.

Please NOTE: the use of this collar will mean that the flue
lengths will need to be altered, full instructions are given in the
kit.

NOTE: If required, an optional Wall Liner Kit, Part No. 900862,
is available, complete with fixing instructions.

Advertising