Diagram 4.10

AIR DUCT/TERMINAL
AND FLUE DUCT
ASSEMBLY

4616

4 Flue and Appliance Preparation

Diagram 4.9

BOILER

CENTRE

LINE

LONG FLUE

TERMINAL

STANDARD
FLUE
TERMINAL

6830

4.9 Air Duct/Terminal and Flue Duct Assembly

Locate the flue duct into the air duct/terminal, see diagram 4.10.

Take the flue manifold from the loose items pack together with
the sealant. Place the sealant onto the flue manifold.

Fully locate the flue manifold in to the air duct/terminal and flue
duct assembly as shown in diagram 4.10, make sure the correct
alignment of the “Top”s.

Drill two 3mm diameter holes through the air duct/terminal to the
flue manifold secure with the two self tapping screws supplied
in the loose items pack.

It should now not be possible to remove the manifold.

4.10 Rear Fitting

Fit the self adhesive foam seal provided in the flue pack around
the air duct/terminal at the position shown in diagram 4.13.

4.11 Side Fitting

Fit the self adhesive foam seal around the air duct/terminal such
that, when installed, the seal will be within the wall, see diagram
4.14.

If dimension "A" is greater than 75mm from the wall, the self
adhesive foam seal can be dispensed with, and the area around
the flue made good in the normal way, see diagram 4.14.

Important: If the wall liner kit is used the self adhesive foam seal
included in the wall liner kit must be used in place of the one
supplied with the flue pack, see diagram 4.11 for position of self
adhesive seal.