4 flue and appliance preparation – Glow-worm Ultimate 30FF User Manual

Page 15

Advertising
background image

15

221518L

4 Flue and Appliance Preparation

Diagram 4.6

Diagram 4.7

FLUE

DUCT

BOILER

CENTRE

LINE

T MINUS 188mm

6833

6831

Q

Diagram 4.8

LONG FLUE

TERMINAL

STANDARD FLUE
TERMINAL

Q PLUS 5mm

Q

6829

4.6 Wall Mounting Bracket

Reposition the template, making sure of dimensional alignment
with the flue hole.

Mark the boiler fixing points and mounting bracket position, see
diagram 4.5.

Drill holes and plug, to suit No.12x2in wood screws, fit the
screws allowing sufficient clearance, about 5mm, to accept the
swing brackets, see diagram 4.5.

Secure the mounting bracket to the wall with No.12x2in wood
screws and plugs, see diagram 4.5.

4.7 Flue Duct

Mark the duct to the length required, this length allows for
expansion, see diagram 4.6 for rear flue and diagram 4.7 for
side flue, then cut square and remove any burrs.

4.8 Air Duct/Terminal

Mark the duct length, see diagram 4.8 for rear flue and diagram
4.9 for side flue, then cut square and remove any burrs.

Advertising