5 boiler installation – Glow-worm Ultimate 60BF User Manual

Page 14

Advertising
background image

14

221791B

5 Boiler Installation

Diagram 5.4

TABLE 4.

SHORT FLUE 100-280 CUTTING LENGTHS

100-150

150-200

200-280

WALL
THICKNESS

AIR DUCT

FLUE DUCT

0

130

130

0

20

190

190

20

70

190

190

70

Diagram 5.3

Flue

Duct

Air

Duct

Wall

Duct

3801

3802

SECURING
SCREW (2)

WALL DUCT

WIRE
GUARDS

OUTER
BAFFLE

WALL
PLATE

SCREW (4)

INNER BAFFLE/
FLUE DUCT
ASSEMBLY

AIR DUCT
ASSEMBLY

Inner Baffle

Flue Duct

5.2 Water Circulation System

Complete the water connections to the boiler.

Fill, vent and cold flush the system as recommended in the
current issue of BS6798.

Check for any water leaks and put right.

5.3 Gas Connection

Make the gas connection to the Rc

1

/

2

in gas service cock.

Check for leaks using a suitable leak detection fluid.

5.4 Control Box

Remove the electrical control box securing screw, see diagram
5.7. Pull the control box down at the front and support on the
hook at the rear of the control box cover, see diagram 5.8.

Advertising