13 servicing, General inspection – Glow-worm Ultracom cxi User Manual

Page 42

Advertising
background image

42

13 Servicing

General Inspection

Prior to, during servicing and after any maintenance or

changed parts, the following must be checked.

● The integrity of the flue system and flue seals.

● The integrity of the appliance combustion circuit and

relevant seals.

● Electrical, gas and water connections.

● System pressure.

● the combustion performance, refer to the following

procedure.

● The operational gas inlet pressure and gas rates, refer to

the commissioning section paragraph 12.5.

Correct any fault before continuing.

COMPETENCY TO CARRY OUT THE CHECK

OF COMBUSTION PERFORMANCE

NOTE: BS 6798: 2009 Specification for installation and

maintenance of gas-fired boilers of rated input not exceeding

70kW net advises that:

● The person carrying out a combustion measurement must

be assessed as competent in the use of a flue gas analyser

and the interpretation of the results.

● The flue gas analyser used should be one meeting the

requirements of BS7927 or BS-EN50379-3 and be calibrated

in accordance with the analyser manufacturers’ requirements.

● Competence can be demonstrated by satisfactory

completion of the CPA1 ACS assessment, which covers

the use of electronic portable combustion gas analysers in

accordance with BS 7967, parts 1 to 4.

● Ensure that the gas analyser is set to the correct fuel

setting.

● Select the “

°C

bar

°C

bar

”, constant central heating with DHW

function by pressing the “Mode” button repeatedly, refer to

commissioning section. The boiler should fire automatically.

NOTE: Safe combustion can only be verified by measuring

CO/CO2 ratio. This must not exceed the value shown in the

table opposite.

COMBUSTION CHECK AND SETTING THE AIR/

GAS RATIO VALVE

● Remove the front casing panel, see diagram 13.2 and hinge

down the control box. Taking care not to touch any internal

components, proceed as follows:

● Connect the CO2 combustion analyser to the relevant test

point, see diagram 13.1.

IMPORTANT NOTES:

1. To ensure the continued efficient and safe operation of the boiler it is recommended that it is checked and serviced at

regular intervals. The frequency of servicing will depend upon the particular installation and usage, but in general once a

year should be enough.

2. It is the Law that any servicing is carried out by a

competent person approved at the time by the Health and Safety

Executive

.

3. Before commencing with a service or replacement of parts the boiler should be isolated from the electrical supply and the

gas supply should be turned off at the gas isolation valve.

4. When replacing a part on this appliance, use only spare parts that you can be assured conform to the safety and

performance specification that we require. Do not use reconditioned or copy parts that have not been clearly authorised

by Glow-worm.

5. If any electrical connections have been disconnected and after their connection, checks to the earth continuity, polarity,

short circuit and resistance to earth must be repeated using a suitable multimeter, as described in section 14.

6. After servicing, complete the relevant Service Interval Record section of the Benchmark Checklist located in the centre

pages of this document.

1. Maximum Rate Check and Adjustment

NOTE: To verify the maximum gas rate CO2 setting the

appliance must be checked at the maximum rate first. Press

the “reset” button on the controls fascia, release and

immediately press and hold in the “+” button. After

approximately 5 seconds “Hi” will be displayed. Pressing

the mode button when “Hi” is selected will force the boiler

to maximum rate, the display will flash between “Hi” and the

“default display” this will indicate the boiler has been forced to

maximum. Wait until the CO2 value is stable and check that

the value is within the range specified in table in the “check”

column.

If the combustion reading is not within the acceptable values

AND the integrity of the complete flue system and combustion

circuit seals have been verified and the inlet gas pressure

(and gas rate) have been verified, then, it will necessary to

adjust the combustion rate of the appliance.

NOTE: Adjustment is made by turning the gas valve throttle

an ⅛ of a turn, waiting 1 minute to allow the appliance to

stabilise before checking or making further adjustments.

● Rotate the “throttle”(anti-clockwise to increase), to the

required CO2, refer to diagram 12.5 and the “SETTING”

column in the table.

● Exit the forced rate function, press the “mode” and “+”

buttons simultaneously, this will reset the boiler to the default

display. Now proceed to check the minimum rate adjustment.

G31 BURNER % CO

2

MODEL

CHECK

(case on)

SETTING

(case off)

CO/CO

2

ratio

24cxi

9.2 to 10.2

10.0 +0.0

- 0.9

0.004

30cxi

10.0 to 11.0 10.5 +0.3

- 0.7

0.004

38cxi

9.2 to 10.2

9.8 +0.2

- 0.8

0.004

G20 BURNER % CO

2

MODEL

CHECK

(case on)

SETTING

(case off)

CO/CO

2

ratio

24cxi

8.5 to 9.6

9.1 +0.2

- 0.5

0.004

30cxi

8.5 to 9.6

9.1 +0.2

- 0.5

0.004

38cxi

8.5 to 9.3

8.8 +0.2

- 0.5

0.004

Advertising