Any assistance – Glow-worm Ultrapower sxi User Manual

Page 19

Advertising
background image

0020054593 - 03/11 - Glow-worm

- 19 -

ANY ASSISTANCE ?

Filling Central Heating System

1. Ensure that the filling loop flexible hose

is securely connected to the double check

inlet valve, see diagram.

2. Fully open tap "A", then gradually

open tap "B" to fill the heating system to a

pressure of 1.0bar. When completed close

the filling taps.

3.

IMPORTANT: To comply with the water

regulations the flexible hose must be

disconnected from the double check inlet

valve - undo the nut and pull the flexible

hose from the valve.

9.3 Appliance safety devices

9.4 Boiler Shutdown

The boiler software is designed to

recognise the potential for an overheat

lockout and will shutdown before this

happens.

• To restart the boiler, press the reset

button, see chapter "How to use your

appliance ► Overview".

If the boiler fails to resume normal

operation and all external controls are

calling for heat, then call your Installation/

Servicing company or Glow-worm service.

Advertising