10 boiler installation – Glow-worm Xtramax User Manual

Page 18

Advertising
background image

18

4000116705-2

10 Boiler Installation

10.1 Warning to the installer

This installation is subject to building regulation approval, notify
the Local Authority of intention to install.

10.2 Installing the boiler

Prior to starting work, the system must be thoroughly flushed
using a propriety cleanser such as Sentinel X300 to eliminate
any foreign matter and contamination e.g. metal filings, solder
particles, oil, grease etc.

Note. Solvent products could cause damage to the system.

IMPORTANT: With regards to the manual handling operations,
1992 regulations, the following operation exceeds the
recommended weight for one man to lift.

• Lay boiler on its back.

• Remove all packaging from around the boiler.

• Remove front panel, put in a safe place to avoid damaging it.

• Ensure the plastic plugs are removed from water and gas
pipes. NOTE: There will be some spillage of water.

• Remove transportation timber support bar from bottom rear of
boiler.

• If required the boiler can be stood upright supported by
extending the legs at the front bottom of the boiler.

• Lift the boiler up and engage boiler upper part onto the hanging
bracket.

• Fit the washers between the boiler pipes and the inlet and
outlet fittings on the fixing jig and connect the various couplings
between the boiler and jig.

• Fit the base panel, hook in at the rear secure with the four self
tapping securing screws at the front.

Advertising