9 installation procedure, 9 installation, Procedure – LINK Systems 5100-8 Tonnage & Analog Signal Monitor User Manual

Page 62: R+ - c s r + - c s, Gage wired for tension, Gage wired for compression

Advertising
background image



Doc

#:

L-802-1110 Page

60 Rev.

02

much as possible. Run cables to the channel connectors on the front of the tonnage monitor
module and cut the excess cable lengths off.

3) Strip about 2 ½ inches of cable insulation off of the braided wire shield. Remove the four

conductor wires from the shield, taking care to leave the shield wire length connected to the
cable.

4) Wire the channel connectors as shown in Figure 36. Cover or tape the shield, to avoid accidental

shorting to any other point.


R

R

+

-

C

S

R

+

-

C

S

Strain Gage

Input Connector

Reference Voltage

Signal Positive

Signal Negative

Common

Shield

Green

White

Red

Black

Gage Wired For

Tension

STRAIN

LINK

R

LST-1000

LINK SYSTEMS

444 McNally Dr.

NASHVILLE, TN 37211

STRAIN

LINK

R

LST-1000

LINK SYSTEMS

444 McNally Dr.

NASHVILLE, TN 37211

R

+

-

C

S

R

+

-

C

S

Strain Gage

Input Connector

Reference Voltage

Signal Positive

Signal Negative

Common

Shield

Green

Red

White

Black

Gage Wired For

Compression

STRAIN

LINK

LST-1000

LINK SYSTEMS

444 McNally Dr.

NASHVILLE, TN 37211

Figure 36: Strain Gage Wiring

Advertising