Iv. seal plate assembly / pins bearing – Nor-Cal Linear Gate Valve User Manual

Page 10

Advertising
background image

10

Nor-Cal Products, Inc., 1967 South Oregon St., Yreka, CA 96097 • Toll Free 800-824-4166 or 530-842-4457 • www.n-c.com

Rev. 1-2013

IV. Seal Plate Assembly / Pins Bearing

1.5”—21”

A. Tools and Materials Required:

1. Allen Wrench Set

2. Arbor Press

3. Punch

4. Hammer

5. Wrenches (Box or Open)

6. R-R Pliers

7. Vacuum Grease

8. IPA

9. Latex Gloves

B. Procedure 4” – 21”

1. Actuate valve to gate Open position.

2. For safety, remove air to actuator.

3. Remove bolts that hold Bonnet Actuator Assembly to body. For Quick-Clamp

Bonnet, undo the clamp.

4. Pull out the Bonnet Actuator Carriage Assembly.

5. Using a punch and hammer, remove the pin that holds the Upper Linkage to the

Lower Linkage-Upper Linkage of Strongback. (Three washers and an R-Ring should be recovered)
Note: If the pin does not move, flip the assembly over and try from the other side.

Caution: Be careful not to bend the Upper Linkage; the use of a wooden

block for support is recommended)

(Continued Next Page)

FIGURE 8: LINKAGE REMOVAL

HAMMER

WOODEN BLOCK

PUNCH
LOWER LINKAGE

UPPER LINKAGE
LOWER LINKAGE - STRONG-

BACK

Advertising