Vortech Alpha H3 Hummer - 2008 User Manual

Page 13

Advertising
background image

P/N: 4GN020-015

©2008 Vortech Engineering, LLC

All Rights Reserved, Intl. Copr. Secured

20OCT08 v2.0 08HummrH3(4GNv1.0)

7

Fig. 5-e

Fig. 5-f

Fig. 5-g

5. MOUNTING BRACKET AND SUPERCHARGER INSTALLATION

, CONT’D.

H.

Remove the 15mm headed screw securing

the ribbed tensioner pulley to the tensioner

arm. Install the supplied 3” steel smooth idler

and secure using the factory hardware and

Ø.692" I.D x .030" thick spacer.

I.

Locate the coolant pipe assembly (4GN114-

020). Secure the Ø3/4” x 90° and Ø5/8” x 90°

molded hoses to their corresponding water

pump ports using the factory hose clamps

from the previously removed hose assembly.

(See Fig. 5-e)

J.

Using the supplied adel clamp secure the

Ø5/8” hose to the coil (front passenger side)

retainer. Route the hose to the heater core

connection at the firewall. Locate and cut the

factory heater hose assembly to obtain the

factory clip connectors (leave yourself extra

hose and trim as necessary) set the 3/4" con-

nector aside. Connect the factory 5/8” clip

connector to the heater core. Use the sup-

plied Ø5/8” union and hose clamps to con-

nect the previously installed mold hose to the

factory heater hose (trim as necessary for

best fit). (See Fig. 1-f, 5-f & 5-g)

Ø 5/8" HOSE

Ø 3/4" HOSE

ADEL CLAMP

COIL

FACTORY 5/8" HOSE

UNION

5/8" HOSE

Advertising