Vortech 2000-2008 Honda S2000 User Manual

Page 35

Advertising
background image

P/N: 4HS020-010

©2008 Vortech Engineering, LLC

All Rights Reserved, Intl. Copr. Secured

21OCT08 v4.0 S2000(4HS020-010v4.0)

23

8. SUPERCHARGER MOUNTING BRACkET/PLATE INSTALLATION, cont’d.

Fig. 8-x

spacer and into the center 12 mm boss

located on the supercharger cover.

4. Two 3/8-16 x 1.25" screws with AN wash-

ers that attach the supercharger support

plate to the supercharger mounting block.

5. M10 x 1.25 x 115 screw through the front

of the supercharger mounting plate and

into the factory idler pulley mount on the

front cover.

6. Two 5/16-18 x 1.0" screws through the

supercharger mounting plate and into the

lateral support.

7. Two M8 x 1.25 x 45 socket head screws

through the lateral support mounting plate,

front corner of the cylinder head and into

the front cover.

8. Three 3/8-24 x 3.5" screws running

through the main mounting plate, Ø.875

O.D. x 1.858" long spacers and into the

threaded steel inserts that are pressed into

the back side of the support plate.

9. Two M6 nuts that are threaded onto the

two studs inserted into the front of the

engine.

X.

Repeat the sequence above with final torqu-

ing of all hardware.

Y.

Reconnect the previously removed VTEC wir-

ing connections.

Z.

(

NOT ON

2006-2008 Models) Reattach

the plastic vacuum canister to the backside of

the front crossmember (located in front of the

engine) using the factory screw that was

removed in step 1. Make sure that there is

enough clearance between the vacuum hose

and the crank pulley.

AA. (2006-2008 Models only) Secure the

stainless steel oil service line away from hot

or morning assemblies that may damage it.

Locate the line so that it maybe easily

accessed for service.

two 5/16-18 x 1"

ScrewS witH

an waSHerS

two M8 x 1.25 x 45

Socket Head ScrewS

(no waSHerS)

Advertising