Final check – Vortech 8-Rib Drive Upgrade for 2011-2012 Mustang GT User Manual

Page 21

Advertising
background image

13

P/N: 007130 v1.0, 2012-02-10

© 2012 Vortech Engineering, LLC

All Rights Reserved, Intl. Copr. Secured.

2. FINAL CHECK

A.

Check all fittings, hose and clamps for tight-

ness and leaks. Make sure all wires and lines

are properly secure with clamps or tie-wraps.

B.

Make sure all wires and hoses are routed

away from hot, moving or sharp objects.

C.

Test drive the vehicle.

D.

Always listen carefully for engine detonation.

Discontinue heavy throttle usage if detonation

is heard.

WARNING: Do not attempt to operate the vehicle until

ALL components are installed and ALL

operations are completed including the

final check.

• Custom ECM programming and fuel / ignition

system upgrades will be required when changing

the supercharger drive pulley to any size other

than what was originally supplied in the complete

supercharger kit.

• A vortech Maxflow Race or Mondo compressor

bypass valve is requires for applicaitons produc-

ing more than 11-12 psig.

Advertising