WaterFurnace Envision2 User Manual
Compact, En vision, Compact ins tallation manual
Advertising

IM1025AN 01/15
Installation Information
Water Piping Connections
Hot Water Connections
Electrical
Startup Procedures
Troubleshooting
Preventive Maintenance
COMPACT
Water Source/Geothermal Heat Pump - 50 Hz
•
R-410A
Refrigerant
• Commercial 005 to 017 kW
En
vision
2
C
ompact Ins
tallation Manual
Advertising
Table of contents
Document Outline
- Table of Contents
- Model Nomenclature
- General Installation Information
- Vertical Dimensional Data
- Horizontal Dimensional Data
- Installing Horizontal Units
- Hanger Bracket Locations
- Duct System
- Water Piping
- Condensate Drain
- Water Quality
- System Cleaning and Flushing
- Open Loop Ground Water Systems
- Hot Water Generator Connections
- Freeze Detection
- Electrical Connections
- Electrical Data
- Blower Performance Data
- Wiring Schematics
- Controls - Aurora Base Control
- Controls - UPC DDC Control (optional)
- Unit Startup
- Operating Limits
- Operating Parameters
- Pressure Drop
- Reference Calculations
- Legend
- Refrigerant Circuit Guideline
- Compressor Resistance
- Thermistor Resistance
- Heat of Extraction/Rejection Data
- Troubleshooting
- Startup and Troubleshooting Form
- Heating Cycle Analysis
- Cooling Cycle Analysis
- Preventive Maintenance
- Replacement Parts
- Service Parts
- Revision Guide