220 Volt Operation

All 220-240 units are factory wired for 240 volt operation.

For 220 volt operation, the red and blue transformer wires

must be switched on terminal strip PS.

CAUTION: When installing a unit with a

variable speed ECM blower motor in 420/50/3

voltage, a neutral wire is required to allow

proper unit operation.

General

Be sure the available power is the same voltage and phase

as that shown on the unit serial plate. Line and low voltage

wiring must be done in accordance with local codes or the

National Electric Code, whichever is applicable.

Power Connection

Connect the incoming line voltage wires to L1 and L2 of the

contactor for single-phase unit. Consult the Electrical Data

tables for correct fuse sizes.

Electrical Connections

For Aurora Base Control, set SW2-1, FP1, on the printed

circuit board for applications using a closed loop antifreeze

solution to -9.4°C. On applications using an open loop/

ground water system (or closed loop no antifreeze), set this

dip switch to -1.1°C, the factory default setting. (Refer to the

Dip Switch Field Selection table).

Freeze Detection

For FX10 board, the “red” wire must be removed from PB2-3

to change from -1.1°C, the factory default setting, to -9.4°C.

FX10 Control Box

Aurora Base Control Box