Pre-installation preparation, Continued, Framing and finishing – Desa CGCDV42PR EN User Manual

Page 7

Advertising
background image

www.desatech.com

116236-01G

7

A

B

E

F

G

H

D

C

Nailing Tabs

Figure 4 - Framing Clearances for

Installation Against an Exterior Wall

40

1

/

8

"

48

1

/

4

"

23" Horizontal

Vent

26

1

/

2

" Vertical

Vent

C

B

A

D

E

F

G

Top of Louver

Opening

3

2

1

4
5
6

7

Wall

Figure 5 - Framing Clearances for Corner

Installation

Ref. Mantel Depth Ref.

Mantel from

Top of Louver

Opening

1

14" (356 mm)

A

16" (406 mm)

2

12" (305 mm)

B

14" (356 mm)

3

10" (254 mm)

C

12" (305 mm)

4

8" (203 mm)

D

10" (254 mm)

5

6" (152 mm)

E

8" (203 mm)

6

4" (101 mm)

F

6" (152 mm)

7

2" (51 mm)

G

4" (101 mm)

Figure 6 - Clearances for Combustible

Mantels

48"

48

1

/

4

"

41

5

/

8

"

58

1

/

2

"

16

3

/

4

"

81

1

/

2

"

13

1

/

2

"

PRE-INSTALLATION

PREPARATION

Continued

Nailing
Tabs

FRAMING AND FINISHING

Figure 4 shows typical framing of this fireplace.

Figure 5 shows framing for corner installation. All

minimum clearances must be met.

For available accessories for this fireplace, see

Accessories on page 42. If you are using a sepa-

rate combustible mantel piece, refer to Figure 6

for proper installation height. You can install

noncombustible mantels at any height above the

fireplace.
Note:

Noncombustible mantels may discolor!

21

5

/

8

"

Advertising
This manual is related to the following products: