Check installation and wiring, Commissioning – Pilz Cable PMCprimoDrive>Mod-Profibus:L=0,45m User Manual
Page 40
![background image](/files/762802/content/doc040.png)
Commissioning
8-2
Operating Manual: PMCtendo AC
Check installation and wiring
Installation
Check the installation and orientation of
the servo motor.
Check the drive elements (clutch, gear unit,
belt pulley) to ensure that they are firmly
seated and set up correctly.
Check that the motor surface is protected
against contact during operation, whether
accidental or intentional.
Check that the rotor of the servo motor can
rotate freely.
- - -
WARNING!
Risk of life-threatening injury when operating the
servo motor
Servo motors with feather key must not be operated
unless the drive pulley is fully installed! Make sure
that the drive connection between the shaft and the
machine has been fully installed.
CAUTION!
Burns
During operation, the surface temperature of the
servo motor can exceed 65 °C!
INFORMATION
If a holding brake is present, this must first be
released (see “Holding brake”).
Check the polarity!