Ups initial startup – Dell H967N User Manual

Page 29

Advertising
background image

29

Installation

|

UPS Initial Startup

To start up the UPS:

1

Verify that the internal batteries are connected.

2

If an optional EBM is installed, verify that the EBM is connected to the UPS.

3

Verify that the power input to the UPS has adequate upstream overcurrent protection:

Table 1. Minimum Upstream Circuit Breaker Rating

UPS Output Power

120V

208V

230V

2700W

30A

20A

16A

The power cord current ratings are listed in Table 2.

Table 2. Power Cord Ratings

Dell UPS Model and Voltage

Power Cord

Rating

Country

Supplied Cord Set

2700W

208V

L6-20P to C19

15A

North America

Yes

C19 to C20 Jumper

16A

North America

Optional

2700W

230V

CEE 7/7 Schuko to C19

16A

Europe (Schuko)

Yes

BS 1363 to C19

13A

United Kingdom (New)

Yes

GB2009.1 to C19

16A

China

Yes

C19 to C20 Jumper

16A

Europe/Australia

Yes

C19 to C20 Jumper

16A

China

Yes

BS 546 to C19

15A

United Kingdom(Old)

Optional

TI16S3 to C19

16A

Thailand

Optional

AS 3112 to C19

15A

Australia

Optional

IRAM2073 to C19

16A

Argentina

Optional

CEI 23-50 to C19

16A

Italy

Optional

KSC8305 to C19

15A

South Korea

Optional

IS 1293 to C19

16A

India

Optional

NBR 14136 to C19

16A

Brazil

Optional

C19 to C20 Jumper

16A

North America

Optional

L6-20P to C19

15A

North America

Optional

Advertising
This manual is related to the following products: