10 FOOT RULE

All flue gas outlet chimney terminations must
extend a minimum of 3 feet in height above
highest point where it passes through the roof
and must be at least 2 feet above highest point
of the roof that is within a horizontal distance
of 10 feet (see Figure 17).

installation

Continued

FINISHING FIREPLACE

Combustible materials, such as wallboard,
gypsum board, sheet rock, drywall, plywood,
etc. may make direct contact with sides and
top around the fireplace face. It is important
that combustible materials do not overlap face
itself. Brick, glass, tile or other noncombustible
materials may overlap front face provided they
do not obstruct essential openings like louvered
slots or any other opening. When overlapping
with a noncombustible facing material, use only
noncombustible mortar or adhesive.

24" Min.

24" Min.

18"

Min.
Typ.

Figure 16 - Multiple Chase Installation

10'

2' Min.

10'

3' Min.

2' Min.

3' Min.

Level of
Flue Gas
Outlet

Figure 17 - 10 Foot Rule

Seal
Opening
with
Refractory
Cement

Outside of
Fireplace

Gas
Line
Conduit

Repack
Insulation

Incoming
1/2" Black
Iron Pipe

Side
Firebrick
Finished
Side

Provide Enough Threaded
End for Fitting Connection

Figure 18 - Gas Line Installation

OPTIONAL GAS LINE
INSTALLATION

Gas line hook up should be done by your sup-
plier or a qualified service person.
Note: Before you proceed, make sure your gas
supply is turned off. Use only a 1/2" black iron
pipe and appropriate fittings.
1. Remove gas line cover plate located on

either side of fireplace and pull out insula-
tion from gas line conduit sleeve. Save
insulation for reuse. Replace screws.

2. Run a 1/2" black iron gas line into fireplace

through rear at gas line conduit sleeve (if us-
ing a raised platform, add height). Provide
sufficient gas line into fireplace chamber for
fitting connection (see Figure 18).

Note: Secure incoming gas line to wood
framing to provide rigidity for threaded
end.

3. Repack insulation around gas line and into

sleeve opening. Seal any gaps between
gas line and refractory knockout hole with
refractory cement or commercial furnace
cement, Install the gas appliance or cap-off
gas line if desired.