Baby Lock Momentum Quilting Frame (BLQM) Instruction and Reference Guide User Manual

Page 10

Advertising
background image

Fig. 5-1-C

M6 Connector Bolt

M6 Plastic Washer

Fig. 5-2-C

Front Rail Bracket Left Rail Holder End

Front Rail Bracket Right Ratchet End

M8 Nylock Nut

M8 x 50mm SBHCS

Fig. 6-2

Rail Holding End

Ratchet End

Back Track Assembly Side

Plastic Track

Back Track Support

Front Track Support

Front Rail Bracket Left Rail Holder

End

M8 x 16mm SBHCS

Fig. 6-1

Page. 9

Parts Needed:

4- 5 ft Plastic Track

Tools Required:

4mm Allen Wrench

5-1-C: Detach the pre-installed Track Support

from the Table Assembly by unfastening the

M6 Connector Bolts with a 4mm Allen Wrench.

(Fig. 5-1-C)

5-2-C: Slide the 5 ft Plastic Track down the

track grooves of the Track Support Assembly.

(Fig. 5-2-C)

5-3-C: Repeat step 5-2 to assemble the 5 ft

Front Track Support Assembly.

5-4-C: Loosely fasten the Front Track Assem-

bly and securely fasten the Back Track Assem-

bly onto the Table Assembly with Connector

Bolts and M6 Plastic Washer. The Rear Track

Assembly side should be flush with the back

edge of the table. (Fig. 5-1)

Note: The Front Track Assembly will be ad-

justed and tightened in step 9.

Parts Needed:

1- Front Rail Bracket Right Ratchet End

1- Front Rail Bracket Left Rail Holder End

4- M8 x 50mm SBHCS

4- M8 Nylock Nut

Tools Required:

5mm Allen Wrench

Open Wrench 13mm and 10mm

Note: The bolt height may need to be adjusted after the

sewing machine has been set on the frame so that fabric

lays flat in the throat of the machine. This assembly step

is universal for both Crib and King size frames.

6-1: Insert the Rail Brackets into the corresponding tube

ends. (Fig. 6-2)

Note: Loosen the M8 x 16mm SBHCS on the Rail Brack-

ets if the brackets are a tight fit into frame ends.

Step 5-C: Track Assembly for Crib Size Frame

Step 6: Front Rail Bracket Assembly

Advertising