Baby Lock Momentum Quilting Frame (BLQM) Instruction and Reference Guide User Manual

Page 22

Advertising
background image

Fig-S. 3-6

Fig-S. 3-5

Take Up Leader

Clamp Rail Lock

Pin

Fig-S. 3-7

Fig-S. 3-8

Top Leader

Quilt Top

Batting

Quilt Backing

Quilt Top

Batting

Top Rail

Batting Rail

Backing Rail

Page. 21

Section 3-7: Disengage the Clamp Rail Lock Pin and

tighten the Idler Rail Assembly by turning the rail Coun-

terclockwise a full rotation. Re-engage the Clamp Rail

Lock Pin ensuring the fabric is wrapped on the Idler Rail.

(Fig-S. 3-5)

Note: Section 3-7 will make the Quilting Surface flat

and taut during quilting while the sliding rail operates.

Sections: 3-2, 3-6, and 3-7 will have to be repeated as

the quilt is rolled up on the Take Up Rail.

Section 3-6: Attach the Backing Leader to the Backing

Rail using the Fabri-Fast System and ratchet the remain-

ing fabric onto the rail. (Section 1: Fabri-Fast System

and Fig-S. 3-7)

Section 3-7: Similarly, attach the Top Leader to the Top

Rail using the Fabri-Fast System and ratchet the remain-

ing fabric onto the rail. (Section 1: Fabri-Fast System

and Fig-S. 3-8)

Section 3-8: The batting can be Fabri-Fasted onto the

Batting Rail if the batting is thin, otherwise tape and roll

it onto the rail to ease batting management. (Fig-S. 3-8)

Note: The Take Up Rail and Batting Rail have no par-

ticular direction of rotation and can rotate both ways

without effecting the frames performance.

Plug the power cords back in after the fabric installation

has been completed.

Advertising