Baby Lock Momentum Quilting Frame (BLQM) Instruction and Reference Guide User Manual

Page 11

Advertising
background image

Fig. 7-1

Non-Ratchet End

Ratchet End

Take Up Rail Left Arm Rail Holder End

Take Up Rail Right Arm Ratchet End

Fig. 8-1

Fig. 8-2

Backside of

the carriage

Sensor

Bracket tab

M6 Set Screw

Fig. 6-3

M8 Nylock Nut

M8 x 50mm SBHCS

Page. 10

Parts Needed:

1- Take Up Rail Right Arm Ratchet End

1- Take Up Rail Left Arm Rail Holder End

2- M8 x 50mm SBHCS

2- M8 Nylock Nut

Tools Required:

5mm Allen Wrench

Open Wrench 13mm and 10mm

Note: The height may need to be adjusted after

the sewing machine has been set on the frame.

This assembly step is universal for both Crib and

King size frames.

7-1: Insert the Rail Brackets into the corresponding

tube ends. (Fig. 7-1)

7-2: Fasten a set of M8 x 50mm SBHCS and M8

Nylock Nuts through the middle hole of the Rail Arm

Brackets. (Fig. 7-1)

Parts Needed:

2- M6 Set Screw

1- Sensor Bracket

1- Carriage Assembly (included

with sewing machine)

1- Master Board Box

1- Power Supply

Tools Required:

3mm Allen Wrench

8-1: Attach and align the Sensor Bracket to the

backside of the carriage. The Sensor Bracket tab

should be flush against the rear of the carriage.

(Fig. 8-1)

8-2: Insert and fasten a set of M6 Set Screws

into the Sensor Bracket. (Fig. 8-2)

Step 7: Take Up Rail Bracket Assembly

Step 8: Bottom Carriage Assembly

6-2: Fasten a set of M8 x 50mm SBHCS and M8 Nylock

Nuts through the second hole from the bottom of the Rail

Brackets as a default. (Fig. 6-2 and Fig. 6-3)

Advertising