Assembly, Earthing, Shielding – BECKHOFF AM2000 User Manual

Page 17: Site, Ventilation, Wiring

Advertising
background image

The following notes should help you to carry out the assembly and wiring in an appropriate se-

quence, without overlooking anything.

The site must be free of conductive and aggressive material.

For V3-mounting (shaft end upwards), make sure that no liquids can
enter the bearings. If an encapsulated assembly is required, please
consult our applications department beforehand.

Ensure an unhindered ventilation of the motors and observe the
permissible ambient and flange temperatures.

For ambient temperatures above 40°C please consult our applications

department beforehand.

During assembly, take care that the motor is not overstressed when it

is fixed in place.

Select cables according to EN 60204

See the table in chapter II.1 when cable length exceeds 25m.

Use correct earthing and EMC-shielding according to the Installation
Instructions for the servoamplifier which is used. Earth the mounting
plate and motor casing. For connection methods see chapter II.2.1

— Route power cables as separately as possible from control cables
— Connect up the resolver
— Connect the motor leads, install ring cores or motor chokes close to

the servoamplifier, connect shields to shielding terminals or EMC

connectors at both ends

— Connect the holding brake, if used, Connect shielding at both ends.

Final check of the installed wiring, according to the wiring diagram
which was used

Motor series AM227..297

17

BECKHOFF

12/2001

Installation / Commissioning

Site

Ventilation

Assembly

Earthing

Shielding

Cable selection

Check

Wiring

Advertising