Installation sequence (continued) – Blu Bathworks BT8001 User Manual

Page 5

Advertising
background image

4

1 866 907 0122 blubathworks.com

2015-02

Installation Sequence (continued)

Note:

any remaining protective packaging should be removed only after the bathtub installation and other construction work in the

bathroom is fully finished.

•

Level the feet of the tub. Lock the bathtub legs into position

by tightening the adjoining nut once an accurate level is confirmed.

5

4

•

The water outlet pipe should be connected.

•

Connect integrated overflow tube to outlet drain.

6

•

Apply silicone to the feet of the bathtub that stands on the floor.

7

•

When the installation is completed, the bathtub is taken down from

the supports. ( ie 2 x 4x4’s)

If necessary, installation is completd
by applying silicone at several points
between the bottom panel and floor.

Advertising
This manual is related to the following products: