Installation Sequence (continued)

Note:

any remaining protective packaging should be removed only after the bathtub installation and other construction work in the

bathroom is fully finished.

Level the feet of the tub. Lock the bathtub legs into position

by tightening the adjoining nut once an accurate level is confirmed.

5

4

The water outlet pipe should be connected.

Connect integrated overflow tube to outlet drain.

6

Apply silicone to the feet of the bathtub that stands on the floor.

7

When the installation is completed, the bathtub is taken down from

the supports. ( ie 2 x 4x4’s)

If necessary, installation is completd
by applying silicone at several points
between the bottom panel and floor.