12 CB 2-e Installation Instructions

1.0 PRE-INSTALLATION

1.1

Electrical preparation – The unit may have supply wires run from either (a) behind the unit

through the wall, or (b) below the unit using an external conduit through the bottom of the

unit. Holes in the back and bottom of the unit have been provided for this purpose.

2.0 INSTALLATION PROCEDURES

2.1 Remove the top of the unit.

2.2

Mark the mounting holes – In order to comply with the Americans with Disabilities Act

(ADA) of 1990, the speakerphone button(s) should be positioned between 34 and 48 inches

from grade level. (Consult an ADA specialist in your area to verify local and federal guide-

lines.)

2.3 Drill all marked holes.

2.4

Install the housing – Four anchors of appropriate size and type should be used to fasten

the housing to the wall.

IMPORTANT: If wiring is supplied from the back, ensure that the conduit is aligned at this

time.

2.5 Reattach the top.

3.0 WIRING

3.1

Ground – The ground (green) wire should be stripped and fastened to the supplied ground-

ing lug.

3.2

24V AC supply – Using the proper crimping tool, attach a #8 fork to each of the incoming

power wires and fasten them to the terminal screws labeled “Line” and “Neutral.”

3.3

120/240V AC supply – Using the proper crimping tool, attach a #8 fork to each of the in-

coming power wires and fasten them to the correct terminals as labeled on the transformer.
After completing the wire connections, install the supplied terminal covers.