Installation – Desa CF26PTA User Manual

Page 13

Advertising
background image

www.desatech.com

113896-01A

13

INSTALLATION

Continued

Figure 16 - Installing Blower Bracket Assembly

Wire Harness

Blower Bracket
Assembly

Screw

Power
Cord

Blower
Control
Shield

Shield Cover

Wire
Harness

Switch

Heat
Deflector

Wiring Routing
Hole

Blue

Red

Switch Plate

Blower Control
Shield

Figure 17 - Installing Switch Plate to Blower Control Shield

Switch Plate

Screw

8. Insert the 4 wire harness into one of the round

holes in the rear of the blower control shield

and through the rectangular hole in the front

of shield (see Figure 16).

9. Reconnect red wire to the AUTO switch posi-

tion. Reconnect blue wire to the ON switch

position. Reconnect green and white wires to

the power cord.

10. Install the switch plate on the blower control

shield with 2 - #10 screws provided (see Fig-

ure 17). Route power cord out of the cabinet

by inserting it through the bushing on the

outer casing (see Figure 16). Plug fan kit into

120-Volt grounded power supply and test

operation. Note: When switch is in the AUTO

position, the fan will start after the heater has

run for a few moments. The fan will continue

to run for several moments after the heater

has been turned off. When switch is in the

ON position, the fan will run until turned to

OFF. Reinstall hood assembly and close lower

louver door.

Advertising