7 final shaft alignment check, 8 electrical connections, 9 protection systems – Flowserve WPG IDP User Manual
Page 15: 5 commissioning, start-up, operation, And shutdown, 1 pre-commissioning procedure, Commissioning and operation (5), Electrical connections (4.8), Pre-commissioning (5.1), Protection systems (4.9)
Advertising

Advertising