Flowserve Chemstar standard User Manual

Page 2

Advertising
background image

CHEMSTAR USER INSTRUCTIONS ENGLISH 71569185 02-10

Page 2 of 44

flowserve.com

CONTENTS

Page

1 INTRODUCTION AND SAFETY............................ 3

1.1 General ........................................................... 3

1.2 CE marking and approvals.............................. 3

1.3 Disclaimer ....................................................... 3

1.4 Copyright ......................................................... 3

1.5 Duty conditions................................................ 3

1.6 Safety .............................................................. 4

1.7 Nameplate and safety labels........................... 7

1.8 Specific machine performance........................ 8

1.9 Noise level....................................................... 8

2 TRANSPORT AND STORAGE.............................. 9

2.1 Consignment receipt and unpacking............... 9

2.2 Handling .......................................................... 9

2.3 Lifting............................................................... 9

2.4 Storage ............................................................ 9

2.5 Recycling and end of product life.................... 9

3 DESCRIPTION ...................................................... 9

3.1 Configurations ................................................. 9

3.2 Name nomenclature........................................ 9

3.3 Design of major parts .................................... 10

3.4 Performance and operating limits ................. 10

4 INSTALLATION.................................................... 10

4.1 Location......................................................... 10

4.2 Part assemblies............................................. 10

4.3 Foundation .................................................... 11

4.4 Grouting ........................................................ 11

4.5 Initial alignment ............................................. 11

4.6 Piping ............................................................ 12

4.7 Final shaft alignment check .......................... 15

4.8 Electrical connections ................................... 15

4.9 Protection systems........................................ 15

5 COMMISSIONING, START-UP, OPERATION

AND SHUTDOWN ........................................... 15

5.1 Pre-commissioning procedure ...................... 15

5.2 Pump lubricants ............................................ 16

5.3 Impeller clearance......................................... 17

5.4 Direction of rotation ....................................... 17

5.5 Guarding ....................................................... 18

5.6 Priming and auxiliary supplies ...................... 18

5.7 Starting the pump .......................................... 18

5.8 Running the pump......................................... 18

5.9 Stopping and shutdown (all series) ............... 19

5.10 Hydraulic, mechanical and electrical duty... 20

Page

6 MAINTENANCE ...................................................20

6.1 General ..........................................................20

6.2 Maintenance schedule...................................21

6.3 Spare parts.....................................................22

6.4 Recommended spares...................................23

6.5 Tools required ................................................23

6.6 Fastener torques............................................24

6.7 Setting impeller clearance .............................24

6.8 Disassembly ..................................................25

6.9 Examination of parts ......................................27

6.10 Assembly .....................................................27

6.11 Sealing arrangements..................................32

7 FAULTS; CAUSES AND REMEDIES ...................33

8 PARTS LISTS AND DRAWINGS .........................35

8.1 Chemstar – Groups A, B and C .....................35

8.2 Chemstar – Group D......................................36

8.3 Chemstar repeller pump – Group B and C

– large bore repeller cover
– bolt-on stuffing box ...................................37

8.4 Chemstar repeller pump – Group B and C

– small bore repeller cover
– integral stuffing box ..................................38

8.5 Chemstar repeller pump – Group B and C

with bolt-on stuffing box – exploded view....39

8.6 General arrangement drawing .......................40

9 CERTIFICATION ..................................................40

10 OTHER RELEVANT DOCUMENTATION

AND MANUALS................................................40

10.1 Supplementary User Instruction manuals....40

10.2 Change notes ..............................................40

10.3 Additional sources of information.................40

Advertising