Flowserve Circulator User Manual

Page 7

Advertising
background image

7

Section C:

Kit Installation Instructions

Available kit options

Option 1:

Pressure switch

Part code UKDPU9802

Option 2:

Safety feature (accumulator)

Part code UKDPU9803

Option 3:

Level switch

Part code UKDPU9805

Option 4:

External heat exchanger

Part code UKDPU9806

Before installing any kit to the circulator, it must be shut

down and disconnected from the main power source. Safe-

ty glasses with side shields must be worn when working

on the unit. Clean the unit of all debris. Familiarize yourself

with these instructions and the components for each kit

before beginning any installation.

Option 1

The pressure switch kit includes:

• 1/4” NPT ball valve

• 1/4” x 1/2” NPT adapter

• Pressure switch, 1/2” NPT

Kit installation instructions

1. Apply Teflon tape and/or Jomar pipe dope or equal to

adapter threads. Start no closer to the end of the

threads than the 2nd thread.

2. Thread 1/4” side of adapter into ball valve finger tight.

Seal Support System

Part No.

Part No.

PSI

to
to

Xxxxxxx

Xxxxxxx Xxxxx Xxxx Xx

Xxxxx xx xxxxxxxxx

Xxxxx xx xxxxxxxxxxx

Xxxxxx

Xxxx Xx.

Xxxx xxxxxx xxxx

xxxxxxxx xx xxxx

xxxxxx xxxxxxxxx

xxxxxx xxxxxxxxx

Figure 1

ball valve

adapter

pressure

switch

3. Thread 1/2” side of adapter into pressure switch finger

tight.

4. Place an open end wrench on the ball valve and an

open end wrench on the pressure switch connection

nut. Tighten connection until ball valve handle is facing

the pressure switch adjustment cover. Do not over

tighten.

5. Apply Teflon tape and/or Jomar pipe dope or equal

to the ball valve threads. Start no closer to the end of

the treads than the 2nd thread.

6. Clean any dirt or debris from the 1/4” NPT connection

on the bottom of the manifold block. Remove the 1/4”

NPT plug from the bottom of the manifold block.

7. Thread the pressure switch assembly into the mani-

fold block finger tight.

8. Place an open end wrench on the ball valve and

tighten into the manifold block. Tighten connections

until ball valve handle is facing away from the

circulator. Do not over tighten. See Figure 1.

9. Rotate the ball valve handle to the off position. Ball

valve is off when handle is rotated 90° to the ball valve

ports.

10. Installation is complete.

11. It is the responsibility of the customer to wire and set

the pressure switch.

12. The pressure switch can be put into service once the

unit is restarted and the customer has verified the

circulator is running normal. Rotate the ball valve

handle 90° to allow flow to the switch.

Advertising