Operation – Flowserve PLUS 5Q User Manual

Page 12

Advertising
background image

1

NORDSTROM HYPREGUN-PLUS 5Q

Flow Control

Nordstrom Valves

Flow Control

Nordstrom Valves

The numbers in parentheses refer to Hypregun-Plus 5Q parts as

illustrated on pages 5 and 6 of this manual.
1. The air coupler (17) will be found attached to the nipple (7)

as shown in Section A-A. The air hose connector should be

connected to the air supply hose.

2. Fasten the can shield (72, Figure 1) in place around the five-

quart (4.7 litre) sealant can below the reinforcing rib and with

the can seam covered by the retainer.

3. Slightly mound the sealant in the container so that the

concave shaped follower plate can be brought down on the

sealant with a minimum entrapment of air.

4. Raise the pump mechanism and sealant follower plate prior

to inserting the sealant container into the gun. By connecting

the air supply hose to the air supply nipple (57, Figure 2) in

the base of the pump and opening the ram needle valve (8,

Section A-A) the follower (34, Figure 1) will rise sufficiently to

clear the top of the sealant container.

5. Place the can with the can shield in the operating position in

the Hypregun-Plus 5Q.

6. Be sure the valve screw (63, Figure 1) in the pump body is

closed. Connect the air supply hose to the nipple (7, Section

A-A). The ram needle valve should be opened slowly causing

the air pressure to force the follower plate (34, Figure 1) down

toward the sealant container.

CAUTION - Keep fingers clear as the follower plate

descends into the sealant container

Care should be exercised that the sealant container is

directly under the follower plate as the two are brought into

contact. Once the follower plate has entered the top of the

sealant container, open the ram needle valve 2 1/2 turns

from closed position.

7. As shown in Section B-B, the relief valve (64) is opened fully

while the valve screw (63, Figure 1) is opened two turns.

8. With the air motor throttle valve closed (3, Figure 1), allow

the column between the sealant container and relief valve

(64, Section B-B) to fill with sealant with the pressure of the

follower plate alone. After a steady flow of sealant is obtained

at the relief valve, open the throttle valve and pump sealant

through the vent valve until there are no air bubbles. (If the

available line pressure is not sufficient to push sealant through

the relief valve by the follower plate pressure alone, open the

air motor throttle valve before the sealant comes out the vent

valve.)

9. After venting of the air is complete, close the valve screw

(63, Figure 1) and the relief valve (64, Section B-B) and read

the pressure gauge (65, Figure 1). If the pressure gauge does

not read several thousand pounds sealant pressure, the relief

valve (64) and the valve screw (63) should be opened again

to allow further venting. Repeat this operation as required.

Occasionally, The Hypregun-Plus 5Q may become air bound

during operation. If this occurs, repeat the procedure for air

venting as outlined above.

10. With the shut-off and relief valve (78, Section B-B) in the

closed position, the button head coupler (69, Section B-B)

should be slipped over the button head fitting on the valve to

be injected. Open the shut-off valve (a small wrench may be

required). Adjust the air throttle valve (3, Figure 1) on the air

motor and observe sealant pressure on the gauge (65, Figure

1) to ensure proper sealant flow and pressure for plug valves.

WARNING - High pressure injection of sealant into

low pressure iron and semi-steel bodied valves

may deform or destroy certain valve parts which

could result in personal injury. Follow the valve

manufacturers recommended procedures for

sealant injection.

11. After the valve is injected with sealant, close the shut-off

and relief valve (78, Section B-B). Remove the button head

coupler (69, Section B-B) from the fitting on the valve. This

may be done without turning off the air supply to the air

motor. By using the shut-off valve, the user can attach the

coupler or remove it from the fitting with the gun retaining

positive pressure.

12. When all of the sealant has been pumped from the sealant

container, close the throttle valve (3, Figure 1) and transfer

the air supply hose to the air supply nipple (57, Figure 2) on

the base of the gun. With the ram needle valve (8, Section

A-A) open, the gun mechanism is raised, lifting the sealant

container off of the gun base. Close the ram needle valve.

13. Unclip the can shield and remove. Remove the can from the

follower. It may be necessary to attach the air supply to the

relief valve nipple (57, Section B-B) and slowly open the relief

valve (64, Section B-B) 1/4 turn to allow air to enter the can.

The can will be forced from the follower.

14. In changing from one service sealant to another, it is advisable

to purge the gun sealant system. To do this, pump the new

sealant through the delivery hose, with the coupler removed,

until the old sealant has been purged.

15. The pressure relief valve (4, Section A-A) is adjusted at the

factory to 125 psi (8.6 bar) cylinder pressure. Use of the

Hypregun-Plus 5Q at higher pressures can result in damage

to the gun.

16. The air motor is rated at 125 psi (8.6 bar). Do not use the

Hypregun-Plus 5Q on air pressures greater than this figure.

Lower air pressures are recommended where delivery capacity

will be adequate. Do not leave air pressure on the gun

indefinitely when not in use.

Operation