Flowserve PMV P4 User Manual

Page 17

Advertising
background image

17

12. How to mount the I/P Unit to

the positioner unit (P5/EP5)

Switch off supply air and disconnect input signal – port I.

Loosen screws 3 and remove connection block 1, the gauge or plug from port Ip, the fitting
from port I and existing gasket 4. Carefully install gasket 6 supplied together with I/P unit.
When correct installed port I will be blocked by the gasket.

Make sure that relief valve spring 5 is installed properly. Install the connection block 1 to
the positioner unit 2.

Remove cover on I/P unit.

Install the I/P unit to the top of the Positioner unit, making sure that the four O-rings are
present and properly seated. Tighten the unit with the three screws. (See fig. 1 and 2 page
16) Screw 1 first, screw 2 last.

WARNING! Units installed in hazardous areas must have proper approvals.

Connect input signal cable to port I

E

and tighten the cable gland (see fig 5 on page 16).

Adjust the O-ring on the I/P Unit housing to desired posi-tion - sealed or drained. (See fig 3
on page 16 or section 9 on page 14).

A gauge indicating output signal from the I/P converter can be installed in port P. Make sure
that the filter plug is tightened before supply air is switched on (Fig 4 on page 16).

2

4

5

1

3

6

Advertising
This manual is related to the following products: