Flowserve G4 Sleeveline Plug Valves User Manual

Page 12

Advertising
background image

12

G4, G4ZHF AND G4R USER INSTRUCTIONS ENGLISH 5-14

1

/

2

"–4"

1. Normal procedures for field replacement of one-piece

sleeves are to be followed for inserting the sleeve,

Section V A (

1

/

2

" &

3

/

4

"), steps 1–3 or Section V B (1"–8"),

steps 1–4.

2. The firesafe top seal assembly differs from the

stan dard G4 top seal and is completed per the following

instructions.

3. The PFA diaphragm (Part 6)

is to be flared on a tapered

bar just enough to slip over

the plug stem (Figure VI-1).

SECTION VI
ASSEMBLY SPECIFICATIONS – FIRESAFE VALVES G4Z, G4ZHF, G4ZR

Note: Part number reference is shown in

Figure VI-1A.

FIGURE VI-1A

TYPICAL ASSEMBLY OF G4Z AND G4ZHF

WRENCH (13)
STOP COLLAR RETAINER (19A)
STOP COLLAR (19)
ADJUSTER FASTENERS (12A)
ADJUSTER (12)
TOP CAP FASTENERS (3A)
TOP CAP (3)
GROUNDING SPRING (17)
THRUST COLLAR (11)
PACKING GRAFOIL

®

(20)

DIAPHRAGM –

STEEL OR MONEL (6A)
DIAPHRAGM (6)

GASKET GRAFOIL

®

(21)

PLUG (2)

SLEEVE (5)

BODY (1)

O-RING* (22)

PLUG* (2)

4. The PFA diaphragm (Part 6)

is placed over the plug

stem with the lip down

using the diaphragm

guide #BY77543A and

#BY79581A (Figure VI-2).

The plug stem should

be checked for nicks

before installing the PFA

diaphragm. Nicks on this

surface could result in

scratches on the lip of

the diaphragm.

5. The metal diaphragm (Part 6A)

is placed over the plug stem

and the hole enlarged just

enough to slip down on the

stem (Figure VI-3).

7. The Grafoil packing ring

(Part 20) is placed over the

stem (Figure VI-5).

FIGURE VI-2

Place PFA diaphragm over plug stem

with lip down using the diaphragm

guide.

1

/

2''

If damaged, the

plug taper and

1/2" in length of

stem must be

repolished to a

surface finish

of 16AA on the

taper and 63AA

on stem.

FIGURE VI-1

Flare PFA diaphragm over

tapered bar.

FIGURE VI-3

Flare metal diaphragm over

plug stem with lip up.

FIGURE VI-4

Metal diaphragm is removed and

reassembled with lip down.

FIGURE VI-5

Grafoil packing ring

placed over stem.

6. The metal diaphragm

is then removed and

re placed with the lip down

(Figure VI-4).

® Grafoil is a registered trademark of Union Carbide Corporation.

*For use on G4Z-HF Alkylation valve.