Maintenance, Repair, Measure interval – Flowserve IOM Control Valves User Manual

Page 22

Advertising
background image



EN

3. Maintenance

Measure

Interval

Clean valve and actuator spindle with

a soft cloth

depending on degree of contamination

Tighten if stuffing box leaks

Caution:

Do not „over seal“

the stuffing box!

Check spring tension and tighten if

necessary

Standard stuffing boxes subjected to

every 10,000 strokes

“normal“ operating conditions

Standard stuffing boxes subjected to

“difficult“ operating conditions

• packing exposed to aggressive medium

• major temperature change during operation

• occurrence of vibrations

• unfavourable installation position

every 5,000 strokes

Spring loaded stuffing box systems and

every 100,000 strokes

“normal“ operating conditions

at least once per year

Spring loaded stuffing box systems and

every 10,000 strokes

“difficult“ operating conditions

Pneumatic linear actuators

maintenance free

Electric linear/rotary actuators

Check spindle/gear

largely maintenance free

if required, lubricate

every 200,000 up-and-down strokes

Electric linear/rotary actuators

Grease (grease nipple)

at least once per year

4. Repair

If a fault or defect occurs which, according to the list of measures

below, requires the customer services department or contract

partner to be contacted, the manufacturer’s guarantee shall be

rendered null and void - and the manufacturer released from

any responsibility - unless the customer services department

or contract partner is duly notified. If the customer performs the

repairs himself, these operating instructions and the respective

disassembly/assembly instructions must be followed to the letter

and carried out in a competent manner. Original replacement

parts must be used in every case.

Control valves are pressure vessels!

Improper opening of the actuator or fitting may result

in bodily injury!

Advertising