Installation – Flowserve ORGS 11-2 User Manual

Page 10

Advertising
background image

10

Technical Data

– continued –

Installation

Installation requirements

Power consumption
5 VA

Fuse
Thermal fuse T

max

= 102 °C

Sensitivity
Range 1:

10 µS/cm

Range 2:

0.5 µS/cm

Code-switch selectable

Electrode voltage
10 V

ss

Outputs for control circuit
Two volt-free relay contacts,
contact material AgNi 0.15 hard gold plated.
Max. contact rating with switching voltages of 24/115/230 V a.c. 8 A resistive/
inductive.
Max. contact rating with a switching voltage of 24 V d.c.: 8 A

Energizing and de-energizing delays
3 seconds, factory set

Indicators and adjustors
Two red LEDs to indicate
“Electrode rod submerged and
output relay energized” status: “No ingress of oil”
One four pole code switch for
selection of sensitivity range

The water sample taken from the cooling water cycle must flow continuously
through the oil detector & alarm ORGS 11-2. We recommend a flowrate of 200 l/h.

The sampling of the cooling water should take place downstream of the location of
a potential oil leakage at the highest point and, if possible, in a horizontal line.
Since the oil flows in the upper part of the pipe we recommend the installation of a
welding pocket according to DIN 2618 for collecting the oil droplets. The line
leading to the measuring pot of the ORGS 11-2 should be vertically ascending,
running directly into the bottom part of the measuring pot. Avoid any narrow parts
in the supply line since they could give rise to undesired emulsification of the oil.

If space is a consideration and the measuring pot has to be installed at a lower
point make sure that the line leading to the measuring pot features sufficiently
sized bends in order to prevent emulsification.

Explanatory Notes

– continued –

Advertising