Operation – Flowserve NRS 2-3 User Manual

Page 15

Advertising
background image

15

Operation

Warning

The terminal strip of the NRS 2-3 is live during operation. This presents the
danger of electric shock.
Cut off power supply before removing or inserting the 19" slide-in unit or
undertaking any kind of installation or maintenance work.

Note

The level switch NRS 2-3 can only be operated and checked in combination
with the level transmitter NRGT 26-1s.

During operation you have to correct the switchpoints if the following
malfunctions occur:

■

Pump is switched on and off too frequently
Increase the distance between the switchpoints

PUMP

ON

and

PUMP

OFF

. Turn the

adjustor to the right.

■

Signal

LOW

LEVEL

too frequently

Raise the switchpoint

PUMP

ON

or lower the switchpoint

LOW

LEVEL

.

Turn the adjustor to the right or the adjustor for

LOW

LEVEL

to the left.

■

Signal

HIGH

LEVEL

too frequently

Raise the switchpoint

HIGH

LEVEL

or lower the switchpoint

PUMP

OFF

.

Turn the adjustor to the right or the adjustor to the left.
If it is not possible to make this rectification install a time relay to delay the signal

LOW

LEVEL

by 2 to 20 sec.

Correct switchpoints

F

H

I

E

F

1. Check the measuring current coming from the level transmitter across the

terminals 5(+) and 6(–) in the case of design “b” and A22/C24 in the case of
design “c” and “d”.
Measuring current: 4 to 20 mA

Check power