Operation – Flowserve NRS 2-3 User Manual

Page 15

Advertising
background image

15

Operation

Warning

The terminal strip of the NRS 2-3 is live during operation. This presents the
danger of electric shock.
Cut off power supply before removing or inserting the 19" slide-in unit or
undertaking any kind of installation or maintenance work.

Note

The level switch NRS 2-3 can only be operated and checked in combination
with the level transmitter NRGT 26-1s.

During operation you have to correct the switchpoints if the following
malfunctions occur:

Pump is switched on and off too frequently
Increase the distance between the switchpoints

PUMP

ON

and

PUMP

OFF

. Turn the

adjustor to the right.

Signal

LOW

LEVEL

too frequently

Raise the switchpoint

PUMP

ON

or lower the switchpoint

LOW

LEVEL

.

Turn the adjustor to the right or the adjustor for

LOW

LEVEL

to the left.

Signal

HIGH

LEVEL

too frequently

Raise the switchpoint

HIGH

LEVEL

or lower the switchpoint

PUMP

OFF

.

Turn the adjustor to the right or the adjustor to the left.
If it is not possible to make this rectification install a time relay to delay the signal

LOW

LEVEL

by 2 to 20 sec.

Correct switchpoints

F

H

I

E

F

1. Check the measuring current coming from the level transmitter across the

terminals 5(+) and 6(–) in the case of design “b” and A22/C24 in the case of
design “c” and “d”.
Measuring current: 4 to 20 mA