Cb/slider systems install track – Harken 3852 System B CB & Slider Battcars: built 2007 to present User Manual
Page 7
7. Hold full-length track piece up to mast.
Loosely install top screw.
Use putty knife to slide additional slugs
and connector slug into place. Loosely
install all nineteen 6 x 20mm screws.
8. Slide tracks up enough to fit next track.
Mast up: Hold upper tracks. Loosen screw
that holds tracks. Slide track up. If screws
bind in mast groove opening, loosen them
untill track slides. Tighten new bottom
screw securely.
9. Repeat until full-length tracks installed.
3850, 3851 Endstop Kit—leave
bottom 9
3
/
8
" (238mm) track off
untill cars are installed.
CB/Slider Systems
Install Track
NOTE: If bottom full-length track blocks
feeder gap, load bottom track slugs before
installing track.
07-01/09
System B (CB/Slider)
7
10. Raise tracks so 9
1
/
2
" (241mm) bottom
feeder track fits.
11. Install bottom feeder track with stop.
CAUTION! Do not let tracks
drop. Severe injury to hands
and/or fingers can result.