Wire direct wire connection, Optional 3-wire connection, Remove center screw – Maytag MEDX6STBW Installation User Manual

Page 12: Prepare your 3-wire cable for direct connection, Connect wires to terminal block, Connect remaining wires, Connect neutral wire

Advertising
background image

12

3-wire Direct Wire Connection

Use where local codes permit connecting cabinet-ground

conductor to neutral wire.

B

5.

Remove center screw

Remove center terminal block screw (B).

Direct wire cable must have 5 ft. (1.52 m) of extra length so

dryer may be moved if needed.
Strip 3

1

/

2

" (89 mm) of outer covering from end of cable. Strip

insulation back 1" (25 mm). If using 3-wire cable with ground

wire, cut bare wire even with outer covering. Shape wire ends

into hooks.

1"

(25 mm)

3½"

(89 mm)

3.

Prepare your 3-wire cable for

direct connection

To connect wires to terminal block, place hooked end of wire

under terminal block screw, facing to the right, squeeze

hooked end together and tighten screw.

4.

Connect wires to terminal block

1.

Prepare to connect neutral

ground wire and neutral wire

B

A

E

Remove center terminal block screw (B). Remove neutral

ground wire (E) from external ground conductor screw (A).

Optional 3-wire Connection

You must verify with a qualified electrician that this grounding

method is acceptable before connecting.

Connect remaining wires

7.

Place hooked ends of remaining direct wire cable wires under

outer terminal block screws (hooks facing right). Squeeze

hooked ends together and tighten screws. Finally, reinsert

tab of terminal block cover into slot of dryer rear panel.

Secure cover with hold-down screw. Now, go to Venting

Requirements.

B

C

Place hooked end of neutral wire (white or center) (C) of direct

wire cable under center terminal block screw (B). Squeeze

hooked end together. Tighten screw.

6.

Connect neutral wire

Advertising